CROSS Safety Report
Collapse of brickwork cladding
This report is over 2 years old
Overview
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door.
Key Learning Outcomes
For building owners and managers:
-
Regular inspections and maintenance can help keep a structure safe and identify any obvious safety issues that may need to be addressed
-
Be aware that safety critical defects may be hidden behind linings
Full Report
Find out more about the Full Report
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others. If you would like to know more, please visit the reporting to CROSS-AUS page.
The external leaf of a brickwork pier at first floor level fell down onto the playground of a school adjacent to the main entrance door. Fortunately, there were no casualties. The reporter believes that the structure is a concrete encased steel frame. Bricks on end had been used on either side of a column between windows to form a cavity and an external skin built without provision for tying back to the main frame (Figure 1).
The school was closed for an initial period of a week whilst investigations were carried out on the rest of the elevation. The brickwork cladding was removed and replaced with an alternative material. The reporter’s firm has advised the local authority in case there are other schools of similar construction in the same ownership.
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Feedback
No feedback has yet been published for this page.
Expert Panel Comments
An Expert Panel comment on the reports we receive. They use their experience to help you understand what can be learned from the reports. If you would like to know more, please visit the CROSS-AUS Expert Panel page.
As with many other reports of masonry falls from buildings it is fortunate that there was nobody underneath at the time of collapse. The SCOTCROSS project which gathered data over a two year period up to August 2007 had 1,200 reports of material falling, or in danger of falling, from old buildings. In 12 cases passers by were injured.
A full report on the project was published by the Scottish Building Standards Division. There is a risk to people from falls such as the one given above, and they are usually due to combinations of poor construction, poor maintenance, and weathering. The most significant failures are those where there is a pattern and hence further falls can be expected if nothing is done.
The Scottish investigation may be extended to other parts of the UK but meanwhile CROSS welcomes reports of falling, or dangerous and about to fall, materials. So far as new construction is concerned this is perhaps a timely reminder that good building practice requires the ability to see how all items are restrained and retained within buildings, and that construction industry professionals should be proficient at good detailing.
It is also a reminder to school authorities and school governors of the importance of regular condition surveys to detect defects before they become dangerous.